Shade improvement tasks.
Have added a concrete slab on our shade at Municipal High Humanist School administration office.
At some point, the shade will be tiled at some point if resources allow in the future.
With Science, we can progress
Attached are images of the shade floor construction works.
![]() |
Ramp fixed |
![]() |
Concrete slab fixed |
![]() |
Concrete floored shade |
![]() |
Ongoing works |
![]() |
Students helping out |
![]() |
Sand and cement |
![]() |
A worker pulling a wheelbarrow filled with soil to aid in backfilling. |
No comments:
Post a Comment